I-Move Traffic Update: Pothole Patching on I-64 and I-265 Tomorrow
Pothole patching will require lane closures on Interstate 64 and I-265 (Gene Snyder Freeway) tomorrow, Thursday, Nov. 16, as part of the I-Move Kentucky project.
Overnight ramp closures on I-265 that were in place Monday and Tuesday night will also continue tonight and tomorrow night.
Work may be adjusted due to weather or other unforeseen events.
Pothole Patching
From 9 a.m. until 11 a.m. tomorrow, the left lane of I-64 East will be closed just east of I-265 (Exit 19) for pothole patching.
I-265 South near US 60/Shelbyville Road (Exit 27) will also be reduced to one lane during this time for pothole patching.
Ramp Closures
From 8 p.m. tonight, Nov. 15, until 6 a.m. tomorrow, the ramp from I-265 North to KY 146/La Grange Road (Exit 30) will be closed for sound wall panel installation.
The same closure will be in place from 8 p.m. Thursday, Nov. 16, until 6 a.m. Friday, Nov. 17.
Drivers should use caution when traveling through active work zones. Signage will be in place to alert drivers of active construction zones and closures.