Week Ahead: Overnight lane closures planned this week on I-64, I-265

The Kentucky Transportation Cabinet continues to make progress on the I-Move Kentucky project as crews work in several areas of I-71, I-64 and I-265. Ongoing work near the I-64/I-265 interchange and shoulder work on I-265 northbound will require lane closures several nights this week.

Nightly starting Tuesday (tonight) from 8 p.m. to 6 a.m. the next morning, traffic will be reduced by one lane in each direction (eastbound and westbound) on I-64 at the I-265 interchange while bridge work is completed and a temporary barrier wall is removed in the area. The lane closures will take place near the I-265 bridge at mile point 19.

Nightly starting Tuesday (tonight) from 8 p.m. to 6 a.m. the next morning, traffic will be reduced by one lane on I-265 northbound for work on the shoulder. The lane closure will start near Aiken Road at mile point 27.7 and continue to La Grange Road at mile point 30.4.

Work schedules may be adjusted due to weather or other unforeseen delays. Drivers should be cautious when traveling through active construction areas. Signage and flaggers will be in place to alert drivers of lane closures and construction zones.

Other I-Move Kentucky Work Areas

I-265 – Work continues to widen the roadway including excavation in the median and paving operations. Ongoing work requires traffic shifts on I-265 northbound and southbound between Shelbyville Road at mile point 26.8 and Taylorsville Road at mile point 23.1. Traffic shifts to enter I-265 from Shelbyville Road to accommodate ongoing construction of new bridge piers for the I-265 bridge also continue this month. See planned traffic impacts listed above.

I-265/I64 interchange – Work continues to rebuild the interchange including a new bridge, access ramps and along I-265 near mile point 25.4. See planned traffic impacts listed above.

 I-71 – Work continues to widen to the roadway including excavation, bridge replacements, paving operations, and the installation sound barrier walls. Ongoing blasting work on I-71 northbound requires rolling lane closures and short-term road closures daily, including some weekends, between noon and 3 p.m. while blasting is completed. Shoulder closures and overnight lane closures may occur during sound barrier wall installation.

 I-71/I-265 interchange – Work continues on new bridges, access ramps and along I-71 near mile point 9.1. The new collector-distributor lane opened earlier this year to improve safety for vehicles entering and exiting the roadway.

Week Ahead: Bridge demolition work on I-265 requires nightly lane closures this week

Traffic will be impacted near Shelbyville Road

The Kentucky Transportation Cabinet continues to make progress on the I-Move Kentucky project as crews work in several areas of I-71, I-64 and I-265. Work to demolish parts of the I-265 northbound bridge over Shelbyville Road will require lane closures several nights this week.

Nightly starting Tuesday (tonight) from 8 p.m. to 6 a.m. the next morning, traffic will be reduced by one lane in each direction on Shelbyville Road while construction crews demolish parts of a bridge overhead. The lane closures will take place near the I-265 interchange at mile point 26.8.

The first phase of construction on the new north pier of the I-265 bridge continues this month. Traffic on Shelbyville Road was shifted to a new traffic pattern to enter I-265 from Shelbyville Road in May to accommodate ongoing bridge construction.

Work schedules may be adjusted due to weather or other unforeseen delays. Drivers should be cautious when traveling through active construction areas. Signage and flaggers will be in place to alert drivers of lane closures and construction zones.

Other I-Move Kentucky Work Areas

I-71 – Work continues to widen to the roadway including excavation, bridge replacements, paving operations, and the installation sound barrier walls. Ongoing blasting work on I-71 northbound requires rolling lane closures and short-term road closures daily, including some weekends, between noon and 3 p.m. while blasting is completed. Shoulder closures and overnight lane closures may occur during sound barrier wall installation.

I-71/I-265 interchange – Work continues on new bridges, access ramps and along I-71 near mile point 9.1. The new collector-distributor lane opened earlier this year to improve safety for vehicles entering and exiting the roadway.

I-265 – Work continues to widen the roadway including excavation in the median and paving operations. Ongoing work requires traffic shifts on I-265 northbound and southbound between Shelbyville Road at mile point 26.8 and Taylorsville Road at mile point 23.1. See planned traffic impacts listed above.

I-265/I64 interchange – Work continues to rebuild the interchange including a new bridge, access ramps and along I-265 near mile point 25.4.

Week Ahead: Bridge demolition work on I-265 requires lane closures Wednesday

Traffic will be impacted near Shelbyville Road

The Kentucky Transportation Cabinet continues to make progress on the I-Move Kentucky project as crews work in several areas of I-71, I-64 and I-265. Work to demolish the railing of the I-265 northbound bridge over Shelbyville Road will require lane closures tonight (Wednesday).

On Wednesday from 8 p.m. to 6 a.m. Thursday, traffic will be reduced by one lane in each direction on Shelbyville Road while construction crews demolish the railing of a bridge overhead. The lane closures will take place near the I-265 interchange at mile point 26.8.

The first phase of construction on the new north pier of the I-265 bridge is underway. Traffic on Shelbyville Road was shifted to a new traffic pattern to enter I-265 from Shelbyville Road earlier this month to accommodate ongoing bridge construction.

Work schedules may be adjusted due to weather or other unforeseen delays. Drivers should be cautious when traveling through active construction areas. Signage and flaggers will be in place to alert drivers of lane closures and construction zones.

Other I-Move Kentucky Work Areas

I-71 – Work continues to widen to the roadway including excavation, bridge replacements, paving operations, and the installation sound barrier walls. Ongoing blasting work on I-71 northbound requires rolling lane closures and short-term road closures daily, including some weekends, between noon and 3 p.m. while blasting is completed. Shoulder closures and overnight lane closures may occur during sound barrier wall installation.

I-71/I-265 interchange – Work continues on new bridges, access ramps and along I-71 near mile point 9.1. The new collector-distributor lane opened earlier this year to improve safety for vehicles entering and exiting the roadway.

I-265 – Work continues to widen the roadway including excavation in the median and paving operations. Ongoing work requires traffic shifts on I-265 northbound and southbound between Shelbyville Road at mile point 26.8 and Taylorsville Road at mile point 23.1. See planned traffic impacts listed above.

I-265/I64 interchange – Work continues to rebuild the interchange including a new bridge, access ramps and along I-265 near mile point 25.4.

Week Ahead: Barrier wall work requires lane closures Wednesday and Thursday nights

Traffic will be impacted on I-71 and I-265

The Kentucky Transportation Cabinet continues to make progress on the I-Move Kentucky project as crews work in several areas of I-71, I-64 and I-265. Work to remove and install temporary barrier walls will require lane closures on I-71 and I-265 tonight (Wednesday) and tomorrow (Thursday).

On Wednesday and Thursday from 8 p.m. to 6 a.m. the next morning, traffic will be reduced to one lane on I-71 southbound while construction crews remove a temporary barrier wall. The lane closure will begin near Chamberlain Lane at mile point 9.8 and continue to the I-265 interchange at mile point 9.1.

On Wednesday and Thursday from 8 p.m. to 6 a.m. the next morning, traffic will be reduced to one lane on I-265 northbound while construction crews install a temporary barrier wall on the left shoulder. The lane closure will begin near Shelbyville Road at mile point 26.8 and continue to Old Henry Road near mile point 29.

Work schedules may be adjusted due to weather or other unforeseen delays. Drivers should be cautious when traveling through active construction areas. Signage and flaggers will be in place to alert drivers of lane closures and construction zones.

Other I-Move Kentucky Work Areas

I-71 – Work continues to widen to the roadway including excavation, bridge replacements, paving operations, and the installation sound barrier walls. Ongoing blasting work on I-71 northbound requires rolling lane closures and short-term road closures daily, including some weekends, between noon and 3 p.m. while blasting is completed. Shoulder closures and overnight lane closures may occur during sound barrier wall installation. See planned traffic impacts listed above.

I-71/I-265 interchange – Work continues on new bridges, access ramps and along I-71 near mile point 9.1. The new collector-distributor lane opened earlier this year to improve safety for vehicles entering and exiting the roadway.

I-265 – Work continues to widen the roadway including excavation in the median and paving operations. Ongoing work requires traffic shifts on I-265 northbound and southbound between Shelbyville Road at mile point 26.8 and Taylorsville Road at mile point 23.1. See planned traffic impacts listed above.

I-265/I64 interchange – Work continues to rebuild the interchange including a new bridge, access ramps and along I-265 near mile point 25.4.

Week Ahead: Striping work requires lane closures on I-265 Monday

Traffic will be impacted between Old Henry Road and Shelbyville Road

The Kentucky Transportation Cabinet continues to make progress on the I-Move Kentucky project as crews work in several areas of I-71, I-64 and I-265. Roadway striping work on I-265 southbound will require a lane closure Monday. This work was rescheduled from Sunday due to weather.

On Monday from 8 p.m. to 6 a.m., traffic will be reduced to one lane on I-265 southbound while construction crews stripe the roadway. The lane closure will begin near Old Henry Road near mile point 29 and continue to Shelbyville Road at mile point 26.8.

Work schedules may be adjusted due to weather or other unforeseen delays. Drivers should be cautious when traveling through active construction areas. Signage and flaggers will be in place to alert drivers of lane closures and construction zones.

Other I-Move Kentucky Work Areas

I-71 – Work continues to widen to the roadway including excavation, bridge replacements, paving operations, and the installation sound barrier walls. Ongoing blasting work on I-71 northbound requires rolling lane closures and short-term road closures daily, including some weekends, between noon and 3 p.m. while blasting is completed. Shoulder closures and overnight lane closures may occur during sound barrier wall installation.

I-71/I-265 interchange – Work continues on new bridges, access ramps and along I-71 near mile point 9.1. The new collector-distributor lane opened earlier this year to improve safety for vehicles entering and exiting the roadway.

I-265 – Work continues to widen the roadway including excavation in the median and paving operations. Ongoing work requires traffic shifts on I-265 northbound and southbound between Shelbyville Road at mile point 26.8 and Taylorsville Road at mile point 23.1. See planned traffic impacts listed above.

I-265/I64 interchange – Work continues to rebuild the interchange including a new bridge, access ramps and along I-265 near mile point 25.4.

Weekend Report: Striping work requires lane closures on I-265 Sunday

Traffic will be impacted between Aiken Road and Shelbyville Road

The Kentucky Transportation Cabinet continues to make progress on the I-Move Kentucky project as crews work in several areas of I-71, I-64 and I-265. Roadway striping work on I-265 southbound will require a lane closure Sunday.

On Sunday from 7 a.m. to 11 a.m., traffic will be reduced to one lane on I-265 southbound while construction crews stripe the roadway. The lane closure will begin near Aiken Road at mile point 27.7 and continue to Shelbyville Road at mile point 26.8.

Work schedules may be adjusted due to weather or other unforeseen delays. Drivers should be cautious when traveling through active construction areas. Signage and flaggers will be in place to alert drivers of lane closures and construction zones.

Other I-Move Kentucky Work Areas

I-71 – Work continues to widen to the roadway including excavation, bridge replacements, paving operations, and the installation sound barrier walls. Ongoing blasting work on I-71 northbound requires rolling lane closures and short-term road closures daily, including some weekends, between noon and 3 p.m. while blasting is completed. Shoulder closures and overnight lane closures may occur during sound barrier wall installation.

I-71/I-265 interchange – Work continues on new bridges, access ramps and along I-71 near mile point 9.1. The new collector-distributor lane opened earlier this year to improve safety for vehicles entering and exiting the roadway.

I-265 – Work continues to widen the roadway including excavation in the median and paving operations. Ongoing work requires traffic shifts on I-265 northbound and southbound between Shelbyville Road at mile point 26.8 and Taylorsville Road at mile point 23.1. See planned traffic impacts listed above.

I-265/I64 interchange – Work continues to rebuild the interchange including a new bridge, access ramps and along I-265 near mile point 25.4.

Week Ahead: Construction work requires lane closures on I-265 tonight

Traffic will be impacted between Old Henry Road and Shelbyville Road

The Kentucky Transportation Cabinet continues to make progress on the I-Move Kentucky project as crews work in several areas of I-71, I-64 and I-265. Construction work on the shoulder on I-265 southbound Monday night will require a lane closure.

On Monday from 8 p.m. to 6 a.m. Tuesday morning, traffic will be reduced to one lane on I-265 southbound for shoulder work. The lane closure will begin near the Old Henry Road near mile point 29 and continue to Shelbyville Road at mile point 26.8.

Work schedules may be adjusted due to weather or other unforeseen delays. Drivers should be cautious when traveling through active construction areas. Signage and flaggers will be in place to alert drivers of lane closures and construction zones.

Other I-Move Kentucky Work Areas

I-71 – Work continues to widen to the roadway including excavation, bridge replacements, paving operations, and the installation sound barrier walls. Ongoing blasting work on I-71 northbound requires rolling lane closures and short-term road closures daily, including some weekends, between noon and 3 p.m. while blasting is completed. Shoulder closures and overnight lane closures may occur during sound barrier wall installation.

I-71/I-265 interchange – Work continues on new bridges, access ramps and along I-71 near mile point 9.1. The new collector-distributor lane opened earlier this year to improve safety for vehicles entering and exiting the roadway.

I-265 – Work continues to widen the roadway including excavation in the median and paving operations. Ongoing work requires traffic shifts on I-265 northbound and southbound between Shelbyville Road at mile point 26.8 and Taylorsville Road at mile point 23.1. See planned traffic impacts listed above.

I-265/I64 interchange – Work continues to rebuild the interchange including a new bridge, access ramps and along I-265 near mile point 25.4.

Weekend Report: Bridge work requires closures and short-term stoppages near I-64/I-265 interchange this weekend

Traffic impacted on I-265 and I-64 while bridge beams are set

The Kentucky Transportation Cabinet continues to make progress on the I-Move Kentucky project as crews work in several areas of I-71, I-64 and I-265. Work to set beams for an I-265 bridge over I-64 will require lane closures and intermittent road closures this weekend. This is in addition to previously announced traffic impacts on I-71 this Friday and Saturday.

On Saturday from 7 a.m. to 6 p.m., traffic will be reduced to one lane on I-265 northbound and southbound to accommodate cranes to set beams for a new bridge over I-64. The lane closures will begin at the I-64 interchange at mile point 25.4 and continue to near the S. Pope Lick Road overpass near mile point 25.

Work to set beams for the bridge will also require traffic to be reduced to two lanes on I-64 eastbound and westbound as well as short-term road stoppages of approx. 15 minutes each on I-64. Rolling road closures will take place as each of the three beams are set over I-64. Closures will be between Blankenbaker Parkway near mile point 17 and Simpsonville Road at mile point 28. These lane closures will provide a staging area for beams and equipment.

I-Move Kentucky previously announced a major closure on I-71 this weekend while the old KY 1294 bridge is demolished. Motorists were shifted to the new bridge Wednesday afternoon to accommodate for this work. Find more information on this closure and detours here.

Work schedules may be adjusted due to weather or other unforeseen delays. Drivers should be cautious when traveling through active construction areas. Signage and flaggers will be in place to alert drivers of lane closures and construction zones.

Other I-Move Kentucky Work Areas

I-71 – Work continues to widen to the roadway including excavation, bridge replacements, paving operations, and the installation sound barrier walls. Ongoing blasting work on I-71 northbound requires rolling lane closures and short-term road closures daily, including some weekends, between noon and 3 p.m. while blasting is completed. Shoulder closures and overnight lane closures may occur during sound barrier wall installation. Work to demolish a bridge will require overnight closures in I-71 N Friday and I-71 S Saturday.

I-71/I-265 interchange – Work continues on new bridges, access ramps and along I-71 near mile point 9.1. The new collector-distributor lane opened earlier this year to improve safety for vehicles entering and exiting the roadway.

I-265 – Work continues to widen the roadway including excavation in the median and paving operations. Ongoing work requires traffic shifts on I-265 northbound and southbound between Shelbyville Road at mile point 26.8 and Taylorsville Road at mile point 23.1.

I-265/I64 interchange – Work continues to rebuild the interchange including a new bridge, access ramps and along I-265 near mile point 25.4. See planned traffic impacts listed above.

Week Ahead: Lane closures planned on I-265, I-71 for construction work

Traffic impacted on I-265 between I-64 and Aiken Road

The Kentucky Transportation Cabinet continues to make progress on the I-Move Kentucky project as crews work in several areas of I-71, I-64 and I-265. Work to patch potholes and on the right shoulder will require lane closures tonight.

On Thursday from 8 p.m. to 6 a.m. Friday, traffic will be reduced to one lane on I-265 northbound for work on the shoulder and to patch potholes. The closure will begin at the I-64 interchange at mile point 25.4 and continue to Aiken Road at mile point 27.7.

Work continues several nights this week between 8 p.m. and 6 a.m. to install sound barrier walls along I-71 southbound. The lane closure will begin near the rest area near mile point 13 and continue past Moser Farm Road at mile point 11.8.

Work schedules may be adjusted due to weather or other unforeseen delays. Drivers should be cautious when traveling through active construction areas. Signage and flaggers will be in place to alert drivers of lane closures and construction zones.

Week Ahead: Bridge work requires lane closures Wednesday

Traffic impacted near the I-64/I-265 interchange while bridge beams are installed

The Kentucky Transportation Cabinet continues to make progress on the I-Move Kentucky project as crews work in several areas of I-71, I-64 and I-265. Work to install beams on I-265 bridge will require lane closures Wednesday.

Starting Wednesday at 11 a.m. until approx. 9 p.m., traffic will be reduced to one lane on I-265 southbound near the I-64 interchange while crews install beams for a new I-265 bridge just south of I-64. The closure will begin just before the I-64 interchange near mile point 25 and continue to past the ramp from I-64 eastbound to I-265 southbound.

Crews are closely monitoring the next wave of forecasted winter weather. Work schedules may be adjusted due to weather or other unforeseen delays. Drivers should be cautious when traveling through active construction areas. Signage and flaggers will be in place to alert drivers of lane closures and construction zones.

Other I-Move Kentucky Work Areas

I-71/I-265 interchange – Work continues on new bridges, access ramps and along I-71 at mile point 9.1. The new collector-distributor lane recently opened to improve safety for vehicles entering and exiting the roadway. No traffic impacts are planned this weekend.

I-265/I-64 interchange – Traffic will be reduced by one lane on I-64 westbound near the I-265 interchange while bridge work is performed overhead for several weeks. The closure will begin after the I-64 westbound to I-265 northbound ramp shifting the acceleration lane for traffic merging onto the mainline roadway to the left at mile point 19. This is in addition to the traffic impact listed above.

I-71 – Blasting work on I-71 northbound and southbound is under way and continues daily. This will require rolling lane closures and short-term road closures daily, including some weekends, between noon and 3 p.m. while blasting is completed near mile point 11.8. Closures are necessary during excavation work for the safety of construction crews and the public.

Excavation work near the I-71 northbound rest area will require temporary closures of the rest stop daily. This closure will ensure the safety of the public and construction crews while evacuation work is conducted nearby. Crews will close the entrance to the rest area at 1 p.m. and check for any remaining vehicles at 2 p.m. before conducting blasting work between 2:30 and 3 p.m. daily. Barricades will be removed, and the rest area will be reopened when deemed safe by construction crews following blasting.

Preparation work in this area is ongoing to allow for widening of the corridor and construction of a new Brownsboro Road (KY 1694) bridge over I-71. This work zone is located between mile point 10.3 and mile point 9.1 of I-71 southbound. No traffic impacts are expected this week. Crews continue to work to extend a culvert that will allow for the widening of I-71. No traffic impacts are expected as work continues between mile point 14.5 and mile point 13.5 of I-71 southbound.