Week Ahead: Bridge work requires lane closures on I-64 Tuesday and Thursday

Traffic will be impacted on I-64 near I-265 interchange

The Kentucky Transportation Cabinet continues to make progress on the I-Move Kentucky project as crews work in several areas of I-71, I-64 and I-265. Bridge work for the I-265 bridge over I-64 will require lane closures on Tuesday and Thursday.

On Tuesday from 8 p.m. to 6 a.m. Wednesday morning, traffic will be reduced to two lanes on I-64 eastbound for bridge work overhead.

On Thursday from 8 p.m. to 6 a.m. Friday morning, traffic will be reduced to two lanes on I-64 westbound for bridge work overhead.

The lane closures will begin near the I-265 interchange at mile point 19.

Work schedules may be adjusted due to weather or other unforeseen delays. Drivers should be cautious when traveling through active construction areas. Signage and flaggers will be in place to alert drivers of lane closures and construction zones.

Other I-Move Kentucky Work Areas

I-71 – Work continues to widen to the roadway including excavation, bridge replacements, paving operations, and the installation sound barrier walls. Ongoing blasting work on I-71 northbound requires rolling lane closures and short-term road closures daily, including some weekends, between noon and 3 p.m. while blasting is completed. Shoulder closures and overnight lane closures may occur during sound barrier wall installation.

I-71/I-265 interchange – Work continues on new bridges, access ramps and along I-71 near mile point 9.1. The new collector-distributor lane opened earlier this year to improve safety for vehicles entering and exiting the roadway.

I-265 – Work continues to widen the roadway including excavation in the median and paving operations. Ongoing work requires traffic shifts on I-265 northbound and southbound between Shelbyville Road at mile point 26.8 and Taylorsville Road at mile point 23.1.

I-265/I64 interchange – Work continues to rebuild the interchange including a new bridge, access ramps and along I-265 near mile point 25.4. See planned traffic impacts listed above.

Weekend Report: Construction work requires lane closures on I-71 and Shelbyville Road this weekend

Traffic will be impacted on Friday and Saturday

The Kentucky Transportation Cabinet continues to make progress on the I-Move Kentucky project as crews work in several areas of I-71, I-64 and I-265. Work to install sound barrier walls on I-71 and restriping operations on Shelbyville Road will require lane closures Friday and Saturday.

On Friday from 9 a.m. to 3 p.m., traffic will be reduced to one lane on Shelbyville Road under the I-265 interchange for striping work. Crews will be restriping the roadway to designate a single turn lane from Shelbyville Road to I-265 southbound at mile point 26.8.

On Saturday from 7 a.m. to 5 p.m., traffic will be reduced to one lane on I-265 northbound to perform striping work. The lane closure will begin near Shelbyville Road at mile point 26.8 and continue to LaGrange Road at mile point 30.4.

Motorists will be shifted to a new traffic pattern to enter I-265 from Shelbyville Road to accommodate bridge construction. The first phase of this shift will be implemented this week. New roadway markings and adjusted traffic signals will assist in directing traffic through these changes. The second phase will be enacted after the North pier of the new I-265 bridge completes construction later this year.

On Saturday from 7 a.m. to 5 p.m., traffic will be reduced to one lane on I-71 southbound while crews install sound barrier walls. The lane closure will begin near the I-71 southbound rest area near mile point 13 and continue to Chamberlain Lane at mile point 9.8.

Work schedules may be adjusted due to weather or other unforeseen delays. Drivers should be cautious when traveling through active construction areas. Signage and flaggers will be in place to alert drivers of lane closures and construction zones.

Other I-Move Kentucky Work Areas

I-71 – Work continues to widen to the roadway including excavation, bridge replacements, paving operations, and the installation sound barrier walls. Ongoing blasting work on I-71 northbound requires rolling lane closures and short-term road closures daily, including some weekends, between noon and 3 p.m. while blasting is completed. Shoulder closures and overnight lane closures may occur during sound barrier wall installation. See planned traffic impacts listed above.

I-71/I-265 interchange – Work continues on new bridges, access ramps and along I-71 near mile point 9.1. The new collector-distributor lane opened earlier this year to improve safety for vehicles entering and exiting the roadway.

I-265 – Work continues to widen the roadway including excavation in the median and paving operations. Ongoing work requires traffic shifts on I-265 northbound and southbound between Shelbyville Road at mile point 26.8 and Taylorsville Road at mile point 23.1.

I-265/I64 interchange – Work continues to rebuild the interchange including a new bridge, access ramps and along I-265 near mile point 25.4.

Week Ahead: Bridge work requires lane closures on I-265 and I-64 this week

Traffic will be impacted near I-265/I-64 interchange

The Kentucky Transportation Cabinet continues to make progress on the I-Move Kentucky project as crews work in several areas of I-71, I-64 and I-265. Work to install supporting pieces of a new bridge on I-265 at the I-64 interchange will require lane closures several nights this week.

Today (Monday) from 8 p.m. to 6 a.m. Tuesday and overnight several nights this week, traffic will be reduced to one lane on I-265 northbound and southbound to install diaphragms on the recently installed beams for a new I-265 bridge. The lane closures will begin near the I-64 interchange at mile point 25.4. Traffic will also be reduced to two lanes on I-64 eastbound and westbound to accommodate this work. The lane closures will begin near the I-265 interchange at mile point 19.

Work schedules may be adjusted due to weather or other unforeseen delays. Drivers should be cautious when traveling through active construction areas. Signage and flaggers will be in place to alert drivers of lane closures and construction zones.

Other I-Move Kentucky Work Areas

I-71 – Work continues to widen to the roadway including excavation, bridge replacements, paving operations, and the installation sound barrier walls. Ongoing blasting work on I-71 northbound requires rolling lane closures and short-term road closures daily, including some weekends, between noon and 3 p.m. while blasting is completed. Shoulder closures and overnight lane closures may occur during sound barrier wall installation.

I-71/I-265 interchange – Work continues on new bridges, access ramps and along I-71 near mile point 9.1. The new collector-distributor lane opened earlier this year to improve safety for vehicles entering and exiting the roadway.

I-265 – Work continues to widen the roadway including excavation in the median and paving operations. Ongoing work requires traffic shifts on I-265 northbound and southbound between Shelbyville Road at mile point 26.8 and Taylorsville Road at mile point 23.1.

I-265/I64 interchange – Work continues to rebuild the interchange including a new bridge, access ramps and along I-265 near mile point 25.4. See planned traffic impacts listed above.

Weekend Report: Bridge work requires closures and short-term stoppages near I-64/I-265 interchange this weekend

Traffic impacted on I-265 and I-64 while bridge beams are set

The Kentucky Transportation Cabinet continues to make progress on the I-Move Kentucky project as crews work in several areas of I-71, I-64 and I-265. Work to set beams for an I-265 bridge over I-64 will require lane closures and intermittent road closures this weekend. This is in addition to previously announced traffic impacts on I-71 this Friday and Saturday.

On Saturday from 7 a.m. to 6 p.m., traffic will be reduced to one lane on I-265 northbound and southbound to accommodate cranes to set beams for a new bridge over I-64. The lane closures will begin at the I-64 interchange at mile point 25.4 and continue to near the S. Pope Lick Road overpass near mile point 25.

Work to set beams for the bridge will also require traffic to be reduced to two lanes on I-64 eastbound and westbound as well as short-term road stoppages of approx. 15 minutes each on I-64. Rolling road closures will take place as each of the three beams are set over I-64. Closures will be between Blankenbaker Parkway near mile point 17 and Simpsonville Road at mile point 28. These lane closures will provide a staging area for beams and equipment.

I-Move Kentucky previously announced a major closure on I-71 this weekend while the old KY 1294 bridge is demolished. Motorists were shifted to the new bridge Wednesday afternoon to accommodate for this work. Find more information on this closure and detours here.

Work schedules may be adjusted due to weather or other unforeseen delays. Drivers should be cautious when traveling through active construction areas. Signage and flaggers will be in place to alert drivers of lane closures and construction zones.

Other I-Move Kentucky Work Areas

I-71 – Work continues to widen to the roadway including excavation, bridge replacements, paving operations, and the installation sound barrier walls. Ongoing blasting work on I-71 northbound requires rolling lane closures and short-term road closures daily, including some weekends, between noon and 3 p.m. while blasting is completed. Shoulder closures and overnight lane closures may occur during sound barrier wall installation. Work to demolish a bridge will require overnight closures in I-71 N Friday and I-71 S Saturday.

I-71/I-265 interchange – Work continues on new bridges, access ramps and along I-71 near mile point 9.1. The new collector-distributor lane opened earlier this year to improve safety for vehicles entering and exiting the roadway.

I-265 – Work continues to widen the roadway including excavation in the median and paving operations. Ongoing work requires traffic shifts on I-265 northbound and southbound between Shelbyville Road at mile point 26.8 and Taylorsville Road at mile point 23.1.

I-265/I64 interchange – Work continues to rebuild the interchange including a new bridge, access ramps and along I-265 near mile point 25.4. See planned traffic impacts listed above.

Weekend Report: Roadway striping work will require lane closures on I-265

Traffic impacted between I-64 and Shelbyville Road

The Kentucky Transportation Cabinet continues to make progress on the I-Move Kentucky project as crews work in several areas of I-71, I-64 and I-265. Work to install striping on the newly paved roadway will require overnight lane closures on a stretch of I-265.

For the next three nights (Thursday, Friday and Saturday) from 8 p.m. until 6 a.m. the following morning, traffic will be reduced to one lane on I-265 northbound and southbound. The closures will begin at the I-64 interchange at mile point 25.4 and continue to Shelbyville Road at mile point 26.8. Lane closures will shift as striping work is completed.

Work schedules may be adjusted due to weather or other unforeseen delays. Drivers should be cautious when traveling through active construction areas. Signage and flaggers will be in place to alert drivers of lane closures and construction zones.

I-Move Kentucky includes widening I-265 from four to six lanes between KY 155 (Taylorsville Road) and I-71 and reconstructing the I-64/I-265 interchange to improve safety and ease traffic flow.

Other I-Move Kentucky Work Areas

I-71/I-265 interchange – Work continues on new bridges, access ramps and along I-71 near mile point 9.1. The new collector-distributor lane opened earlier this year to improve safety for vehicles entering and exiting the roadway. No traffic impacts are expected.

I-265/I-64 interchange – Traffic will be reduced by one lane on I-64 westbound near the I-265 interchange while bridge work is performed overhead for several weeks. The closure will begin after the I-64 westbound to I-265 northbound ramp shifting the acceleration lane for traffic merging onto the mainline roadway to the left at mile point 19. See other traffic impacts listed above on I-265.

I-71 – Blasting work on I-71 northbound and southbound is under way and continues daily. This will require rolling lane closures and short-term road closures daily, including some weekends, between noon and 3 p.m. while blasting is completed near mile point 11.8. Closures are necessary during excavation work for the safety of construction crews and the public.

Preparation work in this area is ongoing to allow for widening of the corridor and construction of a new Brownsboro Road (KY 1694) bridge over I-71. This work zone is located between mile point 10.3 and mile point 9.1 of I-71 southbound. No traffic impacts are expected this week. Crews continue to work to extend a culvert that will allow for the widening of I-71. No traffic impacts are expected as work continues between mile point 14.5 and mile point 13.5 of I-71 southbound.

About I-Move Kentucky

The I-Move Kentucky project includes improvements to four major sections of I-265, I-71 and I-64 through a heavily traveled corridor in Jefferson and Oldham counties. Work on the I-Move project is scheduled to be completed by the end of 2023.

Stay informed through the following channels:

Website I-MoveKY.com
Facebook facebook.com/IMoveKY
Twitter twitter.com/IMoveKY
Email alerts/newsletters – Signup at I-MoveKY.com
Mobile alerts – Text “IMOVEKY” to 74121

Week Ahead: Bridge construction work requires overnight lane closure tonight

Traffic impacted near the I-64/I-265 interchange

The Kentucky Transportation Cabinet continues to make progress on the I-Move Kentucky project as crews work in several areas of I-71, I-64 and I-265. Work on a I-265 bridge over I-64 will require lane closures overnight tonight (Monday).

On Monday from 8 p.m. to 6 a.m., traffic will be reduced by one lane on I-265 northbound near the I-64 interchange while crews continue work started over the weekend on a bridge. The closure will begin just before the I-64 eastbound exit ramp near mile point 25 and continue to just past the I-64 interchange.

Work schedules may be adjusted due to weather or other unforeseen delays. Drivers should be cautious when traveling through active construction areas. Signage and flaggers will be in place to alert drivers of lane closures and construction zones.

Other I-Move Kentucky Work Areas

I-71/I-265 interchange – Work continues on new bridges, access ramps and along I-71 at mile point 9.1. The new collector-distributor lane recently opened to improve safety for vehicles entering and exiting the roadway. No traffic impacts are planned this weekend.

I-265/I-64 interchange – Traffic will be reduced by one lane on I-64 westbound near the I-265 interchange while bridge work is performed overhead for several weeks. The closure will begin after the I-64 westbound to I-265 northbound ramp shifting the acceleration lane for traffic merging onto the mainline roadway to the left at mile point 19. This is in addition to the traffic impact listed above.

I-71 – Blasting work on I-71 northbound and southbound is under way and continues daily. This will require rolling lane closures and short-term road closures daily, including some weekends, between noon and 3 p.m. while blasting is completed near mile point 11.8. Closures are necessary during excavation work for the safety of construction crews and the public.

Preparation work in this area is ongoing to allow for widening of the corridor and construction of a new Brownsboro Road (KY 1694) bridge over I-71. This work zone is located between mile point 10.3 and mile point 9.1 of I-71 southbound. No traffic impacts are expected this week. Crews continue to work to extend a culvert that will allow for the widening of I-71. No traffic impacts are expected as work continues between mile point 14.5 and mile point 13.5 of I-71 southbound.

About I-Move Kentucky

The I-Move Kentucky project includes improvements to four major sections of I-265, I-71 and I-64 through a heavily traveled corridor in Jefferson and Oldham counties. Work on the I-Move project is scheduled to be completed by the end of 2023.

Stay informed through the following channels:

Website www.I-MoveKY.com
Facebook facebook.com/IMoveKY/
Twitter twitter.com/IMoveKY
Email alerts/newsletters – Signup at www.I-MoveKY.com
Mobile alerts – Text “IMOVEKY” to 74121

Weekend Report: Bridge construction work requires lane closures Saturday

Traffic impacted near the I-64/I-265 interchange

The Kentucky Transportation Cabinet continues to make progress on the I-Move Kentucky project as crews work in several areas of I-71, I-64 and I-265. Work on a I-265 bridge over I-64 will require lane closures Saturday.

On Saturday from 7:30 a.m. to 9 p.m., traffic will be reduced by one lane on I-265 northbound near the I-64 interchange while crews move bridge forms. The closure will begin just before the I-64 eastbound exit ramp near mile point 25 and continue to just past the I-64 interchange.

Work schedules may be adjusted due to weather or other unforeseen delays. Drivers should be cautious when traveling through active construction areas. Signage and flaggers will be in place to alert drivers of lane closures and construction zones.

Other I-Move Kentucky Work Areas

I-71/I-265 interchange – Work continues on new bridges, access ramps and along I-71 at mile point 9.1. The new collector-distributor lane recently opened to improve safety for vehicles entering and exiting the roadway. No traffic impacts are planned this weekend.

I-265/I-64 interchange – Traffic will be reduced by one lane on I-64 westbound near the I-265 interchange while bridge work is performed overhead for several weeks. The closure will begin after the I-64 westbound to I-265 northbound ramp shifting the acceleration lane for traffic merging onto the mainline roadway to the left at mile point 19. This is in addition to the traffic impact listed above.

I-71 – Blasting work on I-71 northbound and southbound is under way and continues daily. This will require rolling lane closures and short-term road closures daily, including some weekends, between noon and 3 p.m. while blasting is completed near mile point 11.8. Closures are necessary during excavation work for the safety of construction crews and the public.

Preparation work in this area is ongoing to allow for widening of the corridor and construction of a new Brownsboro Road (KY 1694) bridge over I-71. This work zone is located between mile point 10.3 and mile point 9.1 of I-71 southbound. No traffic impacts are expected this week. Crews continue to work to extend a culvert that will allow for the widening of I-71. No traffic impacts are expected as work continues between mile point 14.5 and mile point 13.5 of I-71 southbound.

Week Ahead: Bridge work requires lane closures Wednesday

Traffic impacted near the I-64/I-265 interchange while bridge beams are installed

The Kentucky Transportation Cabinet continues to make progress on the I-Move Kentucky project as crews work in several areas of I-71, I-64 and I-265. Work to install beams on I-265 bridge will require lane closures Wednesday.

Starting Wednesday at 11 a.m. until approx. 9 p.m., traffic will be reduced to one lane on I-265 southbound near the I-64 interchange while crews install beams for a new I-265 bridge just south of I-64. The closure will begin just before the I-64 interchange near mile point 25 and continue to past the ramp from I-64 eastbound to I-265 southbound.

Crews are closely monitoring the next wave of forecasted winter weather. Work schedules may be adjusted due to weather or other unforeseen delays. Drivers should be cautious when traveling through active construction areas. Signage and flaggers will be in place to alert drivers of lane closures and construction zones.

Other I-Move Kentucky Work Areas

I-71/I-265 interchange – Work continues on new bridges, access ramps and along I-71 at mile point 9.1. The new collector-distributor lane recently opened to improve safety for vehicles entering and exiting the roadway. No traffic impacts are planned this weekend.

I-265/I-64 interchange – Traffic will be reduced by one lane on I-64 westbound near the I-265 interchange while bridge work is performed overhead for several weeks. The closure will begin after the I-64 westbound to I-265 northbound ramp shifting the acceleration lane for traffic merging onto the mainline roadway to the left at mile point 19. This is in addition to the traffic impact listed above.

I-71 – Blasting work on I-71 northbound and southbound is under way and continues daily. This will require rolling lane closures and short-term road closures daily, including some weekends, between noon and 3 p.m. while blasting is completed near mile point 11.8. Closures are necessary during excavation work for the safety of construction crews and the public.

Excavation work near the I-71 northbound rest area will require temporary closures of the rest stop daily. This closure will ensure the safety of the public and construction crews while evacuation work is conducted nearby. Crews will close the entrance to the rest area at 1 p.m. and check for any remaining vehicles at 2 p.m. before conducting blasting work between 2:30 and 3 p.m. daily. Barricades will be removed, and the rest area will be reopened when deemed safe by construction crews following blasting.

Preparation work in this area is ongoing to allow for widening of the corridor and construction of a new Brownsboro Road (KY 1694) bridge over I-71. This work zone is located between mile point 10.3 and mile point 9.1 of I-71 southbound. No traffic impacts are expected this week. Crews continue to work to extend a culvert that will allow for the widening of I-71. No traffic impacts are expected as work continues between mile point 14.5 and mile point 13.5 of I-71 southbound.

Weekend Report: Bridge work requires I-265 lane closure

Traffic impacted on I-265 northbound and southbound near I-64 interchange

The Kentucky Transportation Cabinet continues to make progress on the I-Move Kentucky project as crews work in several areas of I-71, I-64 and I-265. Bridge work over I-64 will require a lane closure tonight and tomorrow.

Starting tonight (Friday) at 8 p.m. until Saturday at 5 p.m., traffic will reduced by one lane on I-265 northbound and southbound to accommodate bridge work at the I-64/I-265 interchange. The closure will begin just before the interchange at mile point 25.4. It will allow construction crews to prep and pour the middle pier of the bridge over I-64.

An ongoing lane closure is also in place on I-64 westbound near the interchange. Temporary rest area closures on I-71 northbound also continue this weekend while blasting work is under way daily.

Work schedules may be adjusted due to weather or other unforeseen delays. Drivers should be cautious when traveling through active construction areas. Signage and flaggers will be in place to alert drivers of lane closures and construction zones.

Other I-Move Kentucky Work Areas

I-71/I-265 interchange – Work continues on new bridges, access ramps and along I-71 at mile point 9.1. The new collector-distributor lane recently opened to improve safety for vehicles entering and exiting the roadway. No traffic impacts are planned this weekend.

I-265/I-64 interchange – Traffic will be reduced by one lane on I-64 westbound near the I-265 interchange while bridge work is performed overhead for several weeks.The closure will begin after the I-64 westbound to I-265 northbound ramp shifting the acceleration lane for traffic merging onto the mainline roadway to the left at mile point 19. This is in addition to the traffic impact listed above.

I-71 – Blasting work on I-71 northbound and southbound is under way and continues daily. This will require rolling lane closures and short-term road closures daily, including some weekends, between noon and 3 p.m. while blasting is completed near mile point 11.8. Closures are necessary during excavation work for the safety of construction crews and the public.

Excavation work near the I-71 northbound rest area will require temporary closures of the rest stop daily. This closure will ensure the safety of the public and construction crews while evacuation work is conducted nearby. Crews will close the entrance to the rest area at 1 p.m. and check for any remaining vehicles at 2 p.m. before conducting blasting work between 2:30 and 3 p.m. daily. Barricades will be removed, and the rest area will be reopened when deemed safe by construction crews following blasting.

Preparation work in this area is ongoing to allow for widening of the corridor and construction of a new Brownsboro Road (KY 1694) bridge over I-71. This work zone is located between mile point 10.3 and mile point 9.1 of I-71 southbound. No traffic impacts are expected this week. Crews continue to work to extend a culvert that will allow for the widening of I-71. No traffic impacts are expected as work continues between mile point 14.5 and mile point 13.5 of I-71 southbound.

About I-Move Kentucky

The I-Move Kentucky project includes improvements to four major sections of I-265, I-71 and I-64 through a heavily traveled corridor in Jefferson and Oldham counties. Work on the I-Move project is scheduled to be completed by the end of 2023.

Stay informed through the following channels:

Website www.I-MoveKY.com
Facebook facebook.com/IMoveKY/
Twitter twitter.com/IMoveKY
Email alerts/newsletters – Signup at www.I-MoveKY.com
Mobile alerts – Text “IMOVEKY” to 74121

Week Ahead: I-71 rest area closure and I-64 lane closure start this week

Traffic will be impacted for several days in Jefferson and Oldham counties

The Kentucky Transportation Cabinet continues to make progress on the I-Move Kentucky project as crews work in several areas of I-71, I-64 and I-265. Excavation work along I-71 and bridge work over I-64 will require ongoing closures starting this week.

Starting tonight (Tuesday) at 8 p.m. and continuing for several weeks, traffic will be reduced to two lanes on I-64 eastbound near the I-265 interchange at mile point 19 for work on the I-265 bridge pier overhead. The left lane will be closed from the I-265 southbound ramp to past the I-265 bridge.

On Wednesday from 9 a.m. until 3 p.m., traffic will be reduced to one lane on I-265 southbound to perform pothole repairs. The lane closure will begin near the I-64 westbound ramp and end at the I-64 bridge at mile point 25.4.

On Thursday from 1 p.m. to approx. 3 p.m. and continuing daily at the same time, the rest area on I-71 northbound at mile point 13 will be temporarily closed. This closure will ensure the safety of the public and construction crews while evacuation work is conducted nearby. Crews will close the entrance to the rest area at 1 p.m. and check for any remaining vehicles at 2 p.m. before conducting blasting work between 2:30 and 3 p.m. daily. Barricades will be removed, and the rest area will be reopened when deemed safe by construction crews following blasting.

On Thursday from 9 a.m. to 3 p.m., traffic will be reduced to one lane on I-71 southbound to mobilize equipment for the installation of a sound wall. The lane closure will begin north of Moser Farm Road near mile point 11.8 and end south of Brownsboro Road at mile point 10.3.

Work schedules may be adjusted due to weather or other unforeseen delays. Drivers should be cautious when traveling through active construction areas. Signage and flaggers will be in place to alert drivers of lane closures and construction zones.

Other I-Move Kentucky Work Areas

I-71/I-265 interchange – Work continues on new bridges, access ramps and along I-71 at mile point 9.1. The new collector-distributor lane recently opened to improve safety for vehicles entering and exiting the roadway. No traffic impacts are planned this week.

I-71 northbound to Moser Farm Road – Blasting work on I-71 northbound and southbound at Moser Farm Road is under way and continues daily. This will require rolling lane closures and short-term road closures daily, including some weekends, between noon and 3 p.m. while blasting is completed near mile point 11.8. Closures are necessary during excavation work for the safety of construction crews and the public.

I-71 southbound between Brownsboro Road bridge and I-265 bridge – Preparation work in this area is ongoing to allow for widening of the corridor and construction of a new Brownsboro Road (KY 1694) bridge over I-71. This work zone is located between mile point 10.3 and mile point 9.1 of I-71 southbound. No traffic impacts are expected this week.

I-71 southbound between Highway 329 and the rest area – Crews continue to work to extend a culvert that will allow for the widening of I-71. No traffic impacts are expected as work continues between mile point 14.5 and mile point 13.5 of I-71 southbound.

I-265 between Taylorsville Road and I-64 – Interior lanes of I-265 between Taylorsville Road and I-64 were recently paved. No traffic impacts are anticipated as crews perform this work and continue drainage and lane widening work in the median between mile point 25.4 and mile point 23.1.

About I-Move Kentucky

The I-Move Kentucky project includes improvements to four major sections of I-265, I-71 and I-64 through a heavily traveled corridor in Jefferson and Oldham counties. Work on the I-Move project is scheduled to be completed by the end of 2023.

Stay informed through the following channels:

Website www.I-MoveKY.com
Facebook facebook.com/IMoveKY/
Twitter twitter.com/IMoveKY
Email alerts/newsletters – Signup at www.I-MoveKY.com
Mobile alerts – Text “IMOVEKY” to 74121